A2178/26
Checking status...
ADTaxiway Operations

Taxiway B section between the B7–C5 junction and link B1 will be commissioned.

2026-10-29 00:01 - 2027-01-21 23:59
Duration:3 months

Period of Applicability

2026-10-29 00:01 - 2027-01-21 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The section of taxiway B between the B7–C5 taxiway-link junction and taxiway link B1 will be commissioned effective 21 January 2027, as referenced in AIP SUP 110/2026.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2178/26 NOTAMN
Q) VECF/QMXXX/IV/NBO/A/000/999/2606N09185E005
A) VEGT B) 2610290001 C) 2701212359
E) REF AIP SUP 110/2026 PARA 2 SUB PARA II AND PARA 4. COMMISSIONING OF
SECN OF TWY B BTN TWY LINK B7-C5 JUNCTION AND TWY LINK B1 WEF 21 JAN
2027.
Was this helpful?