A2483/26
Checking status...
OpsUAS/Drone Operations

UAS operations are planned in designated aerodrome landside and construction zones, subject to runway-status and ATC restrictions.

2026-10-28 22:00 - 2027-01-25 23:59
Duration:aggregated 8 days

Period of Applicability

2026-10-28 22:00 - 2027-01-25 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

UAS operations will take place daily from 2200 to 2359 in Zones A, B and C at the aerodrome landside area and platform construction site. Operations are permitted only when adjacent runways are non-operational; UAS must remain within the defined zones and must not fly over any active runway, taxiway or taxilane. ATC has final authority to approve or terminate operations.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2483/26 NOTAMN
Q) VHHK/QWULW/IV/BO /A /000/005/2219N11355E005
A) VHHH B) 2610282200 C) 2701252359
D) DLY 2200-2359
E) UAS OPS WILL TAKE PLACE AT THE LANDSIDE AREA AND CONSTRUCTION
SITE
AT THE AD PLATFORM BOUNDED BY THE FLW AREAS:
1) ZONE A: 221928N1135409E 221919N1135339E 221851N1135349E
221900N1135420E
2) ZONE B: 221949N1135512E 221921N1135523E 221853N1135427E
221931N1135417E
3) ZONE C: 221956N1135533E 221942N1135624E 221934N1135627E
221926N1135603E 221927N1135543E 221923N1135530E 221952N1135520E
SUBJECT TO THE FLW CONDITIONS:
1) OPS SHALL ONLY BE CONDUCTED WHEN ADJACENT RUNWAY(S) IS OR ARE
NON-OPERATIONAL.
2) UAS SHALL REMAIN WI THE DEFINED AREA AND SHALL NOT FLY OVER ANY
ACTIVE RWY, TWY OR TXL.
3) FINAL APPROVAL OR TERMINATION OF UAS OPS ARE SUBJECT TO ATC
F) SFC G) 420FT AMSL
Was this helpful?