A2818/26
ADRunway Operations

Rainwater harvesting work near the runway 08 approach area requires pilot caution.

2026-11-23 09:58 - 2026-12-31 23:30
Duration:2 months

Period of Applicability

2026-11-23 09:58 - 2026-12-31 23:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Rainwater harvesting work is in the localizer-sensitive area on both sides of the runway 08 approach area, approximately 300 m from the threshold and 85 m from the extended runway centerline. Machinery and equipment reach 15 ft AGL; pilots should exercise caution.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2818/26 NOTAMR A2212/26
Q) VIDF/QMRXX/IV/BO/A/000/999/2649N07548E005
A) VIJP B) 2611230958 C) 2612312330
E) RAINWATER HARVESTING WIP IN THE LOC SENSITIVE AREA ON BOTH SIDE
OF RWY 08 APCH AREA.THE WORKSITE IS LOCATED APRX 300M FM THR RWY 08
AND 85M FM EXTENDED RCL. HGT OF MACHINERY/EQPT 15FT AGL. ALL PILOTS
EXER CTN.
Was this helpful?