A1657/26
Checking status...
ADRunway Operations

Borewell cleaning will occur beyond the runway strip on both sides of the runway.

2026-07-26 08:30 - 2026-08-03 11:30
Duration:SHORTaggregated 2 days

Period of Applicability

2026-07-26 08:30 - 2026-08-03 11:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Rainwater-harvesting borewell cleaning will be carried out north and south of the runway, beyond the runway strip in the transitional surface, daily from 0830 to 1130, using machinery up to 7 m high.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1657/26 NOTAMN
Q) VIDF/QMRXX/IV/NBO/A/000/999/2649N07548E005
A) VIJP B) 2607260830 C) 2608031130
D) DLY 0830-1130
E) EXISTING RAINWATER HARVESTING BOREWELL CLEANING ON NORTH AND
SOUTH SIDE OF RWY, BEYOND THE RWY STRIP IN TRANSITION SFC WILL BE
CARRIED OUT. HGT OF MACHINERY 7M (MAX).
Was this helpful?