A1192/26
Checking status...
OBSConstruction Activity

Construction and cabling work is underway near the runway with 5 m machinery height maximum.

2026-05-30 07:00 - 2026-08-29 18:30
Duration:LONG4 months

Period of Applicability

2026-05-30 07:00 - 2026-08-29 18:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

New drain construction, repair and AGL cabling work is taking place on the north and south sides of the runway at a distance of 105 m from the runway centre line due to civil maintenance work. Machinery height is 5 m maximum. Pilots should exercise caution during landing and takeoff.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1192/26 NOTAMR A0461/26
Q) VIDF/QMRHW/IV/NBO/A/000/999/2649N07548E005
A) VIJP B) 2605300700 C) 2608291830
E) NEW DRAIN CONST, REPAIR AND AGL (AERONAUTICAL GND LGT) CABLING
WORK ON NORTH AND SOUTH OF RWY AT A DIST OF 105M FM RCL DUE CIV
MAINT WORK. HGT OF MACHINERY 5M (MAX). PILOT EXER CTN DURING LDG/
TKOF.