A1702/26
Checking status...
ADRunway Operations

Construction personnel and materials are present beyond 105 m on both sides of runway 09/27.

2026-07-30 12:30 - 2026-10-30 12:30
Duration:LONG4 months

Period of Applicability

2026-07-30 12:30 - 2026-10-30 12:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Construction work is in progress on both sides of runway 09/27, beyond 105 m from the runway centerline. Personnel and materials up to 4.5 m high are present; pilots should exercise caution.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1702/26 NOTAMN
Q) VIDF/QMRHW/IV/NBO/A/000/999/2646N08053E005
A) VILK B) 2607301230 C) 2610301230
E) CONST WIP BOTH SIDE OF RWY 09/27 BEYOND 105M FM RCL. MEN AND
MATERIAL UPTO HGT OF 4.5M AVBL. PILOT EXER CTN.