A1259/26
Checking status...
ADLighting Systems

New PAPI installation in progress on RWY 09/27; existing PAPI remains primary and available.

2026-06-10 12:30 - 2026-07-30 10:30
Duration:2 months

Period of Applicability

2026-06-10 12:30 - 2026-07-30 10:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Installation of a new 4-lamp frangible PAPI with dual interleaved circuits is in progress for both runway directions on RWY 09/27. The existing PAPI remains available and is primary for operations. All work is restricted to scheduled runway closures, and the new PAPI will remain switched off during operations to prevent simultaneous visual display and no impact on runway operations; pilots to exercise caution.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1259/26 NOTAMN
Q) VIDF/QLPXX/IV/NBO/A/000/999/2646N08053E005
A) VILK B) 2606101230 C) 2607301030
E) RWY 09/27 - NEW PAPI INSTL WIP. EXISTING PAPI REMAINS AVBL AND
PRIMARY FOR OPS. INSTL OF NEW 4-LAMP FRANGIBLE PAPI WITH DUAL
(INTERLEAVED) CIRCUITS IN PROGRESS FOR BOTH RWY DIRECTIONS AT
361.017M FM THR RWY 27 AND 360.196M FM THR RWY09, 15M FM RWY
EDGE.ALL WORK RESTRICTED TO SKED RWY CLOSURES. NEW PAPI WILL REMAIN
SWITCHED OFF DRG OPS. ENSURING NO SIMULTANEOUS VISUAL DISPLAY AND NO
IMPACT ON RWY OPS. PILOTS TO EXER CTN.