G0897/26
Checking status...
NavApproach Procedures

Trial RNAV 1 Point Merge System operations apply to STARs for runways 27R and 27L.

2026-09-03 00:00 - 2026-09-16 23:59
Duration:14 days

Period of Applicability

2026-09-03 00:00 - 2026-09-16 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

AIRAC AIP Supplement 150/2026 introduces trial operations of an RNAV 1 Point Merge System for STARs serving runways 27R and 27L, valid from 3 September 2026 through 2 December 2026.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

G0897/26 NOTAMN
Q) VOMF/QPATT/I/BO/A/000/999/1312N07742E005
A) VOBL B) 2609030000 C) 2609162359
E) TRIGGER NOTAM - AIRAC AIP SUP 150/2026 WEF 03 SEP 2026.
TRIAL OPERATIONS RNAV 1 POINT MERGE SYSTEM - STARS RWY 27R / 27L.
(VALIDITY: 03 SEP 2026 TO 02 DEC 2026).
Was this helpful?