A3351/26
Checking status...
ADRunway Operations

Runway 12/30 is unavailable for operations, with emergency availability and coordinated taxi access to a portion of the runway.

2026-10-31 12:30 - 2026-11-06 12:30
Duration:SHORT6 days

Period of Applicability

2026-10-31 12:30 - 2026-11-06 12:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 12/30 is unavailable for operations but can be made available within 120 minutes in an emergency. The portion between taxiways L1 and T is available for taxi with prior apron control coordination. Runway 07/25 scheduled maintenance will not take place on 3 November 2026 from 0930 to 1130 UTC; scheduled maintenance at the runway intersection will take place on 3 November 2026 from 0830 to 0930 UTC.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A3351/26 NOTAMN
Q) VOMF/QMRLC/IV/NBO/A/000/999/1300N08011E005
A) VOMM B) 2610311230 C) 2611061230
E) RWY 12/30 NOT AVBL FOR OPS
RMK:
1. RWY 12/30 WILL BE MADE AVBL WI 120 MIN IN CASE OF EMERG.
2. PORTION OF RWY 12/30 BTN TWY L1 AND TWY T WILL BE AVBL FOR TAXI
WITH PRIOR COOR WITH APN CTL
3. RWY 07/25 SKED MAINT WILL NOT BE CARRIED OUT ON 03 NOV
2026 BTN 0930 AND 1130 UTC - REF EAIP AD2 VOMM 2.23 ABT RWY
MAINT WORKS.
4. SKED MAINT WORK AT THE RWY INT WILL BE CARRIED OUT ON 03 NOV 2026
BTN 0830 AND 0930 UTC, AS PER AIP.
Was this helpful?