Period of Applicability
2026-10-01 05:00 - 2026-12-28 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Runway 28 threshold is displaced by 520 m due to stopway extension work. The displaced runway portion is unavailable for aircraft movement. The displaced threshold is identified by daytime runway markings and by elevated wing-bar and end lights for night or low-visibility operations. Pilots must exercise caution during landing and takeoff. The turn pad at the displaced threshold of Runway 28 is unavailable. Revised TORA, TODA, ASDA and LDA are 2,530 m for both Runway 10 and Runway 28.