Period of Applicability
2026-08-17 09:36 - 2026-11-15 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
RWY 05/23 is unavailable for fixed-wing aircraft operations except taxiing. Construction is in progress on the RWY 05 overrun area and parallel taxi track between TWY S1 and TWY S2. The portion of RWY 05/23 between TWY S3 and TWY S4 is available for aircraft taxiing and helicopter operations. TXL L1, TXL L2, and the newly constructed parallel taxi track portion between them are available for taxiing and helicopter operations.