A4390/26
Checking status...
ADTaxiway Operations

Specified sections of taxiways B, C and J, B5 to B13, C8, C9, and taxilanes T18 and T19 are closed for work.

2026-11-05 19:00 - 2026-11-05 23:30
Duration:VERY SHORT5 hours

Period of Applicability

2026-11-05 19:00 - 2026-11-05 23:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Due to work in progress, the following taxiway sections are closed: taxiway B between C7 and B13; B5 to B13; taxiway C between C7 and C9; C8; C9; taxiway J between C and J2; taxilane T18 between taxiway C and behind aircraft stand S101; and taxilane T19 between taxiway C and behind aircraft stand S102.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A4390/26 NOTAMN
Q) VTBB/QMXLC/IV/BO/A/000/999/1341N10045E005
A) VTBS B) 2611051900 C) 2611052330
E) TWY CLSD DUE TO WIP DETAIL AS FLW:
-TWY B BTN TWY C7 AND TWY B13
-TWY B5 TO TWY B13
-TWY C BTN TWY C7 AND TWY C9
-TWY C8
-TWY C9
-TWY J BTN TWY C AND TWY J2
-TXL T18 BTN TWY C AND BEHIND ACFT STAND NR S101
-TXL T19 BTN TWY C AND BEHIND ACFT STAND NR S102
Was this helpful?