A4476/26
ADRunway Operations

Work is in progress on the runway strip beside runway 03.

2026-11-15 01:00 - 2026-11-30 23:00
Duration:aggregated 12 days

Period of Applicability

2026-11-15 01:00 - 2026-11-30 23:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work is in progress on the runway strip to the right of runway 03, 145 m from the runway centerline, daily 0100–1000 and 1500–2300. Equipment height is limited to 32 ft, and the construction area near the runway will be cleared for safety when the runway is in use.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A4476/26 NOTAMN
Q) VTBB/QMWHW/IV/M/A/000/999/1957N09953E005
A) VTCT B) 2611150100 C) 2611302300
D) DAILY 0100-1000 1500-2300
E) STRIP RWY 03/21 WIP ALONG THE RIGHT SIDE OF RWY 03
DIST 145M FM RCL
RMK: 1.MAX EQPT HGT 32FT
2.CONST AREA NEAR RWY WILL BE CLEARED FOR SAFETY OPS DRG RWY
IN USED