A2942/26
Checking status...
ADAirport Operations

Intermittent grass cutting is in progress near specified taxiways and runway 02L/20R sections.

2026-09-07 01:30 - 2026-09-16 10:30
Duration:SHORTaggregated 4 days

Period of Applicability

2026-09-07 01:30 - 2026-09-16 10:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Grass cutting is in progress intermittently between flights along the specified movement-area sections: south of taxiway W5, east of taxiway W between W5 and W1, both sides of taxiway W3, north of taxiway W1, and west of runway 02L/20R between W1 and W5, daily from 0130 to 1030.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2942/26 NOTAMN
Q) VVHM/QMAHW/IV/BO/A/000/999/1200N10913E005
A) VVCR B) 2609070130 C) 2609161030
D) DAILY 0130-1030
E) GRASS CUTTING IN AREA DRG INTERMITTENT TIME BTN FLIGHTS,
DETAILS AS FLW:
ALONG TWY W5 TO THE SOUTH, ALONG TWY W (A PORTION FM TWY W5
TO TWY W1) TO THE EAST, ALONG BOTH SIDES OF TWY W3, ALONG
TWY W1 TO THE NORTH, ALONG RWY 02L/20R (A PORTION FM TWY W1
TO TWY W5) TO THE WEST.
Was this helpful?