Work in progress on specified areas during no flight operations at VVPB.
2025-02-28 00:00 - 2025-04-06 16:59
Period of Applicability
2025-02-28 00:00 - 2025-04-06 16:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Work is being conducted in three areas: around the PAPI for runway 09, a portion of the runway strip from taxiway E2 to the ground point of runway 27, and the runway safety area (RESA) for runway 27. These works will take place when there are no flight operations.
Message
WIP ON AREAS WHEN THERE ARE NO FLT OPS, DETAIL AS FLW: - AREA 1: AROUND PAPI RWY 09 - AREA 2: RWY STRIP 09/27 (PORTION FM TWY E2 TO GP RWY 27) - AREA 3: RESA RWY 27.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-02-25 07:22
Was this helpful?