A2156/26
Checking status...
ADAirport Operations

Work in progress on multiple movement areas.

2026-06-30 00:30 - 2026-08-12 16:59
Duration:2 months

Period of Applicability

2026-06-30 00:30 - 2026-08-12 16:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work in progress on multiple movement-area locations, including areas north and south of the runway 27 and 09 centreline references, portions between taxiways, and adjacent apron areas.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2156/26 NOTAMN
Q) VVHM/QMAHW/IV/BO/A/000/999/1624N10742E005
A) VVPB B) 2606300030 C) 2608121659
E) WIP ON AREAS, DETAILS AS FLW:
- AREA 1: 78M-205M FM RCL TO THE NORTH
- AREA 2: PORTION FM TWY E2 TO GP RWY 27, 120M-214M FM RCL
TO THE SOUTH
- AREA 3: 380M FM THR RWY 27 TO THE EAST
- AREA 4: SOUTH OF THR RWY 09, 150M-226M FM RCL TO THE SOUTH
- AREA 5: BTN TWY E2 AND APN, 205M FM RCL TO THE SOUTH, 45M
FM CL OF TWY E2 TO THE EAST
- AREA 6: SOUTH OF THR RWY 27, 110M FM RCL TO THE SOUTH,
1040M FM CL OF TWY E2 TO THE WEST
- AREA 7: BTN TWY W3 AND TWY W4, 78M FM RCL TO THE SOUTH,
30M FM CL OF TWY W4 TO THE WEST, 10M FM CL OF TWY W3 TO THE EAST
- AREA 8: BTN TWY W2 AND TWY W3, 78M FM RCL TO THE SOUTH,
20M FM CL OF TWY W3 TO THE WEST, 80M FM CL OF TWY W2 TO THE EAST
- AREA 9: 118M FM RCL TO THE SOUTH, 70M FM CL OF TWY E2 TO
THE EAST.
Was this helpful?