Work on the runway 18/36 strip involves heavy equipment; aircraft should exercise caution.

2026-10-20 14:00 - 2026-11-28 22:00
Duration:aggregated 14 days

Period of Applicability

2026-10-20 14:00 - 2026-11-28 22:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work is in progress on the runway 18/36 strip, 384 m beyond threshold 36 and within 24 m on both sides of the centerline, daily from 1400 to 2200. Heavy equipment is present; all aircraft are advised to exercise caution.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B1366/26 NOTAMN
Q) WIIF/QMWHW/IV/M  /A /000/999/0028N10127E005
A) WIBB B) 2610201400 C) 2611282200
D) DAILY 1400-2200
E) STRIP RWY 18/36 WIP PSN 384M BEYOND THR 36, 24M BOTHSIDE OF
CENTERLINE
RMK: - HEAVY EQUIPMENT PRESENT AND ALL ACFT CTN ADZ