Pipeline inspection along the Petronas pipeline
2024-11-14 23:00 - 2024-11-20 10:00
Period of Applicability
2024-11-14 23:00 - 2024-11-20 10:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
A pipeline inspection will take place along the Petronas pipeline from 2300 to 1000, with a 50m left and right buffer from the specified coordinates.
Message
PIPELINE INSPECTION WILL TAKE PLACE ALONG THE PETRONAS PIPELINE FM: 030701.83N 1011938.48E - 030713.54N 1011921.88E - (NPS20 TNB KAPAR REGULATOR LATERAL) RMK: 1. 50M LEFT AND RIGHT BUFFER FM...
Map Visualization
Preview
Loading map data
Please wait...
© OpenStreetMap contributors