J4194/26
EST
Checking status...
ADRunway Operations

RWY 01/19 operating length is reduced due to work, with the RWY 19 threshold displaced.

2026-09-06 20:00 - 2026-12-04 12:00
Duration:aggregated 2 months EST

Period of Applicability

2026-09-06 20:00 - 2026-12-04 12:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 01/19 has reduced operating length due to work in progress. The RWY 19 threshold is displaced 478 m, and the operating length is reduced by 418 m at the north end. Declared distances are: RWY 01 TORA 1960 m, TODA 2020 m, ASDA 1960 m, LDA 1960 m; RWY 19 TORA 2020 m, TODA 2222 m, ASDA 2020 m, LDA 1960 m. Supplementary takeoff distances and gradients apply as published, and MOWP YBTL 02/2026 Stage 2 refers. Effective Monday to Friday from 2000 to 1200.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

J4194/26 NOTAMN
Q) YBBB/QMTCM/IV/NBO/A/000/999/1915S14646E005
A) YBTL
B) 2609062000 C) 2612041200 EST
D) MON-FRI 2000-1200
E) RWY 01/19 REDUCED LEN DUE WIP
THR RWY 19 DISPLACED 478M
RWY 01/19 OPR LEN REDUCED BY 418M N END
DECLARED DISTANCE AND GRADIENT CHANGES
RWY TORA       TODA             ASDA       LDA
01  1960(6428) 2020(6625)(2.0)  1960(6428) 1960(6428)
19  2020(6625) 2222(7287)(2.65) 2020(6625) 1960(6430)
SUPPLEMENTARY TKOF DISTANCES
RWY01- 1960(6428)(1.6) 2007(6583)(1.9)
RWY19- 1493(4898)(1.6) 2074(6804)(1.9) 2154(7067)(2.2)
2203(7228)(2.5)
REFER METHOD OF WORKING PLAN (MOWP) YBTL 02/2026 STAGE 2
Was this helpful?