H7778/26
Checking status...
ADTaxiway Operations

The GA lane between Link 2 and Maxem Apron is closed, with specified pushback and towing procedures for affected departures.

2026-09-22 02:05 - 2026-09-24 02:00
Duration:SHORT2 days

Period of Applicability

2026-09-22 02:05 - 2026-09-24 02:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The general aviation lane between Link 2 and Maxem Apron is closed. Departures from Bay 7 must push back tail northwest and be towed forward abeam Bay 8 before engine start and disconnect. Departures from Maxem and Revesco Aprons must push back tail east and be towed forward abeam Bay REV2 before engine start and disconnect, in accordance with MOWP YPPH 04-26 Stage 2B and 03-26 Stage 2.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

H7778/26 NOTAMR H7596/26
Q) YMMM/QMXLC/IV/BO/A/000/999/3156S11558E005
A) YPPH
B) 2609220205 C) 2609240200
E) GA LANE BTN LINK 2 AND MAXEM APN CLOSED
BAY 7 TAIL NORTH WEST DEPARTURES PUSH BACK AND TOW FORWARD ABEAM BAY
8 PRIOR TO ENGINE START AND DISCONNECT
DEPARTURES FROM MAXEM AND REVESCO APN PUSH BACK TAIL EAST AND TOW
FORWARD ABEAM BAY REV2 PRIOR TO ENGINE START AND DISCONNECT
REF METHOD OF WORKING PLANS (MOWP) YPPH 04-26 STAGE 2B AND 03-26
STAGE 2
Was this helpful?