H8437/26
Checking status...
ADTaxiway Operations

The GA lane between Link 2 and the MAXEM apron is closed, with a revised departure procedure for Bay 7.

2026-10-13 07:48 - 2026-10-22 23:00
Duration:10 days

Period of Applicability

2026-10-13 07:48 - 2026-10-22 23:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The GA lane between Link 2 and the MAXEM apron is closed. Aircraft departing Bay 7 tail northwest must push back and be towed forward abeam Bay 8 before engine start and disconnect, in accordance with MOWP YPPH 04-26 Stage 2B.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

H8437/26 NOTAMR H7869/26
Q) YMMM/QMXLC/IV/BO/A/000/999/3156S11558E005
A) YPPH
B) 2610130748 C) 2610222300
E) GA LANE BTN LINK 2 AND MAXEM APN CLOSED
BAY 7 TAIL NORTH WEST DEPARTURES PUSH BACK AND TOW FORWARD ABEAM BAY
8 PRIOR TO ENGINE START AND DISCONNECT
REF METHOD OF WORKING PLAN (MOWP) YPPH 04-26 STAGE 2B
Was this helpful?