G4709/26
EST
Checking status...
OBSCrane Operations

Four cranes in the runway 01R takeoff flight path affect one-engine-inoperative performance.

2026-10-23 01:00 - 2026-12-22 15:59
Duration:3 months EST

Period of Applicability

2026-10-23 01:00 - 2026-12-22 15:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Four lighted cranes in the runway 01R takeoff flight path affect one-engine-inoperative performance; conduct a performance evaluation. The cranes are approximately 4.4–4.6 km from the aerodrome reference point and are each 65 m long.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

G4709/26 NOTAMN
Q)ZGZU/QOBCE/IV/M/A/000/999/2323N11319E005
A)ZGGG B)2610230100 C)2612221559 EST
E) OBSTACLES WITHIN A CIRCLE WITH A RADIUS OF 15KM CENTERED ON THE
ARP:
OBSTACLE ID/DESIGNATION   TYPE    POSITION MAG BRG(DEGREE)/DIST(M)
ELEVATION(M)   MARKING/LIGHTING TYPE AND COLOUR
CRANE    CRANE     353/4,550   66.6    LGT       RWY01R TAKE-OFF
FLIGHT PATH
CRANE    CRANE     354/4,508   65.3    LGT       RWY01R TAKE-OFF
FLIGHT PATH
CRANE    CRANE     352/4,450   64.7    LGT       RWY01R TAKE-OFF
FLIGHT PATH
CRANE    CRANE     353/4,386   62.8    LGT       RWY01R TAKE-OFF
FLIGHT PATH
REMARK: THE LENGTH OF EACH CRANE IS 65M, THE FOUR CRANE AFFECT ONE
ENGINE FAILURE PERFORMANCE FOR RWY01R,PLS CONDUCT PERFORMANCE
EVALUATION.
Was this helpful?