Period of Applicability
2026-09-29 03:20 - 2026-12-22 15:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Four lighted cranes (IDs 01–04) are erected within 15 km of the ARP, approximately 6,050–6,168 m southwest of the ARP at magnetic bearings 222°–223°, with elevations of 66.4–75.1 m. The cranes affect one-engine-inoperative performance for RWY 19L and RWY 19R; operators should conduct a performance evaluation.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?