G2527/26
EST
Checking status...
NavDeparture Procedures

Gutang NDB 'W' limitation makes specific SID procedures unavailable.

2026-06-23 11:39 - 2026-09-20 15:59
Duration:LONG3 months EST

Period of Applicability

2026-06-23 11:39 - 2026-09-20 15:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Due to Gutang NDB 'W' 388 kHz being limited to use, the following SID procedures are unavailable: RWY 36L (ZGHA-7C) OLT-O3D, and RWY 36R (ZGHA-7D) OLT-04D, both by ATC.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

G2527/26 NOTAMR G1148/26
Q)ZGZU/QPDAU/I/NBO/A/000/999/2811N11313E005
A)ZGHA B)2606231139 C)2609201559 EST
E) DUE TO GUTANG NDB 'W' 388KHZ LIMITED TO USE,FLW SID PROCEDURE
U/S:
1.SID RWY36L(ZGHA-7C): OLT-O3D(BY ATC).
2.SID RWY36R(ZGHA-7D): OLT-04D(BY ATC).
Was this helpful?