L0785/26
Checking status...
NavDeparture Procedures

SID climb gradient requirement is amended for BUKPU.

2026-07-08 16:00 - 2026-09-02 15:59
Duration:2 months

Period of Applicability

2026-07-08 16:00 - 2026-09-02 15:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Reference AIP China ZLLL-3V-2: delete note number 3, the climb gradient from DER to BUKPU should not be less than 3.8%; add that the climb gradient from Wangjiachuan VOR/DME DJC to BUKPU is not less than 4.7%.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

L0785/26 NOTAMN
Q)ZLHW/QPDXX/IV/NBO/A/000/999/3631N10337E005
A)ZLLL B)2607081600 C)2609021559
E) REF AIP CHINA ZLLL-3V-2:
1. DELETE:THE NOTE NR.3(THE CLIMB GRADIENT FROM DER TO BUKPU
SHOULD NOT LESS THAN 3.8%).
2. ADD:THE CLIMB GRADIENT FROM WANGJIACHUAN VOR/DME 'DJC' TO BUKPU
NOT LESS THAN  4.7%.
Was this helpful?