F3191/26
EST
Checking status...
OpsFlight Procedures

Landing Information Deliver trial procedures apply to arrivals at ZSNT.

2026-08-06 07:32 - 2026-12-31 15:59
Duration:LONG5 months EST

Period of Applicability

2026-08-06 07:32 - 2026-12-31 15:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

A Landing Information Deliver (LID) operational trial is in effect for arrivals to ZSNT. Shanghai Approach will send a data-link LID message 50 minutes before ETA containing the expected arrival procedure, any required transition, landing runway and advisory parking stand. Pilots may use it for FMS preparation without ACC radio confirmation, must report the procedure, transition and runway on initial contact with Shanghai Approach, and must then follow controller confirmation, modifications and subsequent instructions. Pilots not receiving LID information must follow current procedures; parking stand information is for reference only, and ATC should not be contacted airborne about stand allocation.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

(F3191/26 NOTAMR F2390/26  Q)ZSHA/QXXXX/IV/NBO/AE/000/999/3204N12059E005  A)ZSNT B)2608060732 C)2612311559 EST  E) IMPLEMENT THE LID(LANDING INFORMATION DELIVER) OPERATION  TRIAL.THE BASIC LID PROCEDURE AS FOLLOW:  1.SHANGHAI APPROACH WILL ISSUE THE LID MESSAGE BY DATA-LINK TO  ARRIVAL FLIGHTS TO ZSNT 50 MINUTES BEFORE ETA.  2.THE LID INFORMATION WILL INCLUDE EXPECTED ARRIVAL PROCEDURE,  TRANSITION(ON REQUIRED), LANDING RUNWAY AND PARKING STAND.  3.PILOT CAN DIRECTLY USE THE LID INFORMATION FOR FMS PREPARATION  DURING CRUISE PHASE WITHOUT RADIO CONFIRMATION BY ACC.PRKG STAND  INFORMATION FOR REFERENCE ONLY,BASED ON AD ALLOCATION,DO NOT  CONTACT ATC FOR PRKG STAND INFORMATION IN AIR.  4.ON INITIAL CONTACT SHANGHAI APPROACH,PILOT SHOULD ADVISE YOUR  LID INFORMATION INCLUDING EXPECTED ARRIVAL PROCEDURE,  TRANSITION(IF ANY), AND LANDING RUNWAY.  5.SHANGHAI APPROACH WILL CONFIRM OR MODIFY FROM PILOT LID REPORT.  6.AFTER ESTABLISH RADIO COMMUNICATION WITH SHANGHAI APPROACH, ALL  CHANGE FOR THE LANDING INFORMATION SHOULD BE JUST FOLLOWED THE  INSTRUCTION BY CONTROLLER .  7.IF PILOT DO   )  // // NOT RECEIVE THE LID INFORMATION, PILOT SHOULD FOLLOW THE  CURRENT PROCEDURE.  8.FOR BETTER IMPROVE THE LID SERVICE, PLEASE TELL US YOUR  SUGGESTION AND COMMENTS TO EMAIL AT ANY TIME:  SUNY1(A)ATMB.NET.CN   )  // //
Was this helpful?