M2276/26
Checking status...
OBSOther

New wind-turbine obstacles affect RWY 03 departure and multiple RWY 21 approach procedures.

2026-07-30 04:16 - 2027-01-29 15:59
Duration:VERY LONG7 months

Period of Applicability

2026-07-30 04:16 - 2027-01-29 15:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

New wind-turbine obstacles are added around RWY 03/21. Two within 15 km affect the RWY 03 departure procedure and RWY 21 VOR/DME final approach; two between 15 km and 50 km affect the RWY 21 ILS/DME GP-inoperative and VOR/DME intermediate approaches, and the RWY 21 RNP and RNP ILS/DME intermediate approaches.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

M2276/26 NOTAMN
Q)ZSHA/QOBCE/IV/M/A/000/999/3711N12214E005
A)ZSWH B)2607300416 C)2701291559
E) ADD NEW OBSTACLES WITHIN A CIRCLE WITH A RADIUS OF 15KM
(CENTERED ON THE CENTER OF RWY03/21):
OBSTACLE ID/DESIGNATION  TYPE POSITIONMAG BRG(DEGREE)/DIST(M)
ELEVATION(M) MARKING/LIGHTING TYPE& COLOURFLIGHT
PROCEDURE/TAKE-OFF PATH AREA AFFECTED
WIND TURBINES    WIND TURBINES    040/8,221    211.4    LGT
RWY03 DEPARTURE PROCEDURE
WIND TURBINES    WIND TURBINES    042/8,411    230.5    LGT
RWY21 VOR/DME  FINAL APPROACH
AD NEW OBSTACLES BETWEEN TWO CIRCLES WITH THE RADIUS OF 15KM AND
50KM (CENTERED ON THE CENTER OF RWY03/21)
OBSTACLE ID/DESIGNATION  TYPE POSITIONMAG BRG(DEGREE)/DIST(M)
ELEVATION(M) MARKING/LIGHTING TYPE& COLOURFLIGHT
PROCEDURE/TAKE-OFF PATH AREA AFFECTED
WIND TURBINES     WIND TURBINES     010/18,956    331     -
RWY21 ILS/DME ,GP INOP,VOR/DME INTERMEDIATE APPROACH
WIND TURBINES     WIND TURBINES     020/19,716    282     -
RWY21 RNP,RNP ILS/DME INTERMEDIATE APPROACH
Was this helpful?