Y0211/25
NOTAM Active
Approach Procedures

AD operation minima changed for RWY06 and SID RWY24.

2025-02-27 02:00 - 2025-05-31 15:59

Period of Applicability

2025-02-27 02:00 - 2025-05-31 15:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Changes were made to the approach and climb minima for RWY06 and SID RWY24 including new decision heights and visibility requirements. The HUD special CAT I is out of service and GP inoperative.

Message

AD OPERATION MINIMA CHANGED AS FLW: 1.RWY06 IAC ILS/DME Y,ILS/DME X: A/B/C/D DH CHANGED TO 80M,RVR/VIS CHANGED TO 800/800M,HUD SPECIAL CAT I U/S. 2.RWY06 IAC ILS/DME X,ILS/DME Y: A/B/C/D GP INOP MDH ...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Y0211/25 NOTAMR Y1592/24
Q) ZYSH/QPMCH/IV/NBO/A/000/999/4651N13028E005
A) ZYJM B) 2502270200 C) 2505311559 EST
E) AD OPERATION MINIMA CHANGED AS FLW:
1.RWY06 IAC ILS/DME Y,ILS/DME X:
A/B/C/D DH CHANGED TO 80M,RVR/VIS CHANGED TO 800/800M,HUD SPECIAL 
CAT I U/S.
2.RWY06 IAC ILS/DME X,ILS/DME Y:
A/B/C/D GP INOP MDH CHANGED TO 170M,VIS CHANGED TO 2,400M.
3.SID RWY24,SID NDB RWY24,SID RNP RWY24:MINIMUM CLIMB GRADIENT 4.0 
PERCENT.
Issued at: 2025-02-27 02:15
Was this helpful?