A0419/25
Checking status...
Runway Operations

Work in progress on runway 08 at 800m from threshold 08 and 30m to RCL.

2025-02-11 07:15 - 2025-03-12 08:00

Period of Applicability

2025-02-11 07:15 - 2025-03-12 08:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Work is being conducted on the left side of runway 08. The work is located 800 meters from threshold 08 and 30 meters from runway centerline. Personnel and equipment are present, and following tower instructions is required.

Message

WIP ON LEFT SIDE RWY 08. 800M FM THR 08 AND 30M TO RCL MEN AND EQPT PRESENCE. FLW TWR INSTRUCTIONS

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0419/25 NOTAMR A0109/25 
Q) DAAA/QMRHW/IV/BO/A/000/999/2249N00527E005
A) DAAT B) 2502110715 C) 2503120800 EST
E) WIP ON LEFT SIDE RWY 08. 800M FM THR 08 AND 30M TO RCL
MEN AND EQPT PRESENCE. FLW TWR INSTRUCTIONS
Issued at: 2025-02-11 07:17