A0402/25
Checking status...
Runway Operations

Work in progress parallel to RWY 02/20 for 150m from right side of RCL.

2025-02-09 06:57 - 2025-04-09 09:00

Period of Applicability

2025-02-09 06:57 - 2025-04-09 09:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Work in progress parallel to runway 02/20 for a distance of 150 meters on the right side, east of runway 02. Use caution and follow tower instructions.

Message

WIP PARALLEL RWY 02/20 FOR DISTANCE OF 150M FROM RCL RIGHT SIDE AT EAST OF RWY 02 CTN ADVICED FLW TWR INSTRUCTIONS

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0402/25 NOTAMR A3165/24 
Q) DAAA/QFAHW/IV/NBO/A/000/999/2249N00527E005
A) DAAT B) 2502090657 C) 2504090900 EST
E) WIP PARALLEL RWY 02/20 FOR DISTANCE OF 150M FROM RCL RIGHT SIDE AT
EAST OF RWY 02 CTN ADVICED FLW TWR INSTRUCTIONS
Issued at: 2025-02-09 06:58