A1703/26
EST
Checking status...
ADRunway Operations

Work in progress on the left side of runway 08 with men and equipment present.

2026-05-26 08:45 - 2026-07-24 08:30
Duration:2 months EST

Period of Applicability

2026-05-26 08:45 - 2026-07-24 08:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work in progress on the left side of runway 08, 800 m from threshold 08 and 30 m to the runway centre line, with men and equipment present. Follow tower instructions.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1703/26 NOTAMR A1014/26
Q)DAAA/QMRHW/IV/BO/A/000/999/2249N00527E005
A)DAAT B)2605260845 C)2607240830 EST
E)WIP ON LEFT SIDE RWY 08. 800M FM THR 08 AND 30M TO RCL
MEN AND EQPT PRESENCE. FLW TWR INSTRUCTIONS
Was this helpful?