A2031/26
Checking status...
ADAirport Operations

Secondary supply is not available, with a 15-second maximum switchover time.

2026-06-16 13:42 - 2026-07-31 23:59
Duration:2 months

Period of Applicability

2026-06-16 13:42 - 2026-07-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Secondary supply is not available. Maximum switchover time is 15 seconds.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2031/26 NOTAMR A2030/26
Q) EBBU/QFAXX/IV/NBO/A /000/999/5112N00252E005
A) EBOS B) 2606161342 C) 2607312359
E) NO BREAK SECONDARY SUPPLY NOT AVBL. MAXIMUM SWITCH-OVER TIME 15
SEC.