A1110/25
Checking status...
Flight Procedures

Changes to SID due to maintenance of LMA NDB.

2025-04-03 07:00 - 2025-04-03 12:00

Period of Applicability

2025-04-03 07:00 - 2025-04-03 12:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

There's a modification to the Standard Instrument Departures (SID) at EDDL due to maintenance of the LMA NDB. The GPS/FMS RNAV overlay remains unchanged. For various runways, after passing specific altitudes, BRNAV equipment is necessary, and references are made to the AIP for further details.

Message

CHANGES TO SID DUE TO MAINT OF LMA NDB: GPS/FMS RNAV OVERLAY REMAIN UNCHANGED. RWY 23L, LMA 3T AND NETEX 6T ADD RMK: AFTER PASSING 2000 BRNAV EQPT NECESSARY. REF AIP AD 2 EDDL 5-7-1/-2 EFF 28 NOV ...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1110/25 NOTAMN
Q) EDGG/QPDCH/I /NBO/A /000/999/5117N00645E005
A) EDDL B) 2504030700 C) 2504031200
E) CHANGES TO SID DUE TO MAINT OF LMA NDB: GPS/FMS RNAV OVERLAY 
REMAIN UNCHANGED. 
RWY 23L, LMA 3T AND NETEX 6T ADD RMK: AFTER PASSING 2000 BRNAV EQPT 
NECESSARY. 
REF AIP AD 2 EDDL 5-7-1/-2 EFF 28 NOV 2024, 5-7-3 DATED 28 NOV 2024. 
RWY 23R, LMA 3H AND NETEX 3H ADD RMK: AFTER PASSING 2000 BRNAV EQPT 
NECESSARY. 
REF AIP AD 2 EDDL 5-7-7 EFF 28 NOV 2024, 5-7-8, 5-7-9 BOTH 
DATED 28 NOV 2024. 
RWY 05R, LMA 2Z ADD RMK: AFTER PASSING 2100 BRNAV EQPT NECESSARY. 
REF AIP AD 2 EDDL 5-7-11 EFF 28 NOV 2024, 5-7-13 DATED 28 NOV 2024. 
RWY 05L, LMA 7Y ADD RMK: AFTER PASSING 2100 BRNAV EQPT NECESSARY. 
REF AIP AD 2 EDDL 5-7-15 EFF 28 NOV 2024, 5-7-17 DATED 28 NOV 2024.
Issued at: 2025-03-10 12:41
Was this helpful?