Period of Applicability
2025-11-20 11:27 - PERM
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Changes to the GIVMI 1N SID from RWY 26R at EDDM due to WLD DVOR/DME coverage: replace “on heading 299° to intercept R119 WLD, on R119 WLD” with “on track 299°”; climb with a 4.9% (300 ft/NM) gradient until passing 3700 ft; BRNAV equipment is required after passing 3700 ft. Refer to AIP AD 2 EDDM 5-7-37 effective 23 May 2019 and 5-7-41 dated 02 Oct 2025.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?