Period of Applicability
2026-10-27 09:33 - 2026-12-15 11:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Flight crews requiring engine ice shedding must advise Delivery before start-up and provide the expected duration. Whenever possible, aircraft with aerodrome reference code letter C must perform engine ice shedding at an assigned taxiway location at no more than 70% thrust. If engine ice shedding is required on a runway, crews must inform ATC before reaching the holding point.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?