A2016/26
Checking status...
ADTaxiway Operations

Taxiways B (between A2–G1), G1, and C (between A2–A3) closed due to work in progress.

2026-04-24 17:00 - 2026-05-08 17:00
Duration:14 days

Period of Applicability

2026-04-24 17:00 - 2026-05-08 17:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Taxiway B is closed between taxiway A2 and taxiway G1, taxiway G1 is closed, and taxiway C is closed between taxiway A2 and taxiway A3 due to work in progress.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2016/26 NOTAMN
Q) EDMM/QMXLC/IV/BO /A /000/999/5125N01214E005
A) EDDP B) 2604241700 C) 2605081700
E) TWY B CLSD BTN TWY A2 AND TWY G1.
TWY G1 CLSD.
TWY C CLSD BTN WY A2 AND TWY A3.
DUE TO WIP.