Period of Applicability
2026-05-22 10:24 - 2026-08-22 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
Interpretation
Missed approach procedures are changed due to limited coverage of DRN DVOR/DME. The RNP missed approach procedure remains unchanged. Runway 26L: climb on track 263° SKZ to 1.8 DME LLD or 900, whichever is later, then left turn on R092 GOT to 5000 and expect radar vectors by ATC. In case of radio communication failure, when reaching 5000 and on R092 GOT, proceed direct to JOGGA for the standard approach procedure. Runway 26R: climb on track 263° ZIG to 1.2 DME LND or 900, whichever is later, then right turn on R062 GOT to 4000 and expect radar vectors by ATC. In case of radio communication failure, when reaching 4000 and on R062 GOT, proceed direct to LOFTO for the standard approach procedure. Effective 26 Dec 2024.