Period of Applicability
2026-05-06 12:50 - 2026-06-26 14:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
Interpretation
Standard instrument departures are changed due to maintenance of BMN DVOR. GPS (FMS)/RNAV overlay remains unchanged. For runway 09, GESTO 8M: climb with 4.8 percent (290 ft/NM) or more until passing 2100, then RNAV5 equipment necessary. For runway 27, SOFED 2L: climb via BMN on R268 BMN is amended to climb on track 268 degrees, with 4.8 percent (290 ft/NM) or more until passing 2400, then RNAV5 equipment necessary. OKWEL 1L, WSN 1L, GESTO 1L, NIE 2L and WIMCI 1L: climb straight ahead via BMN on R266 BMN is amended to climb on track 266 degrees. Ref AIP AD 2 EDDW 5-7-5 dated 17 Apr 2025, 5-7-6 eff 20 Mar 2025, and 5-7-7 dated 27 Nov 2025.