Obstacle clearance raised for SIDs RWY 09 due to wind power plant and chimney.
2025-04-08 14:17 - 2025-07-07 23:59
Period of Applicability
2025-04-08 14:17 - 2025-07-07 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Obstacle clearance for Standard Instrument Departures (SIDs) on RWY 09 has been raised due to a wind power plant located 5.15 NM ESE of the departure end and a chimney located 2.55 NM ENE of the departure end. The clearance is increased to different altitudes based on the specific obstacles until reaching 1100 feet MSL for the wind plant and 600 feet MSL for the chimney.
Message
PDG RAISED FOR SIDS RWY 09: NIE 2M, WIMCI 1M, SOFED 2M PDG 3.7PERCENT UNTIL PASSING 1100FT MSL. DUE TO WIND POWER PLANT PSN 5.15NM ESE OF DEP-END RWY 09 NORMAL USE, PSN 5.0NM ESE OF DEP-END RWY 09 SPE...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-04-08 14:17