Period of Applicability
2026-03-16 07:30 - 2026-06-14 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Departure climb gradient increased to 3.7% on RWY 09 SIDs NIE 2M, WIMCI 1M, and SOFED 2M up to passing 1100 ft MSL due to a wind power plant located about 5 NM ESE of the RWY 09 departure end. Departure climb gradient increased to 3.7% on RWY 09 SIDs GESTO 8M, WSN 1M, and OKWEL 1M up to passing 600 ft MSL due to a chimney located about 2.6 NM ENE of the RWY 09 departure end. Reference AIP AD 2 EDDW 5-7-1.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?