All SIDs are unavailable due to construction.
2025-05-14 20:59 - 2025-07-09 21:01
Period of Applicability
2025-05-14 20:59 - 2025-07-09 21:01
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
All Standard Instrument Departures (SIDs) are unavailable due to construction, including RNAV SID RWY 03 (ARFUT 2B, IBSAN 4B, MARXO 2B, NEMGU 4B, NEPIX 4B, OLNOP 4B, RENVI 4B, ROTKO 4B) and RNAV SID RWY 21 (ARFUT 2A, IBSAN 4A, MARXO 2A, NEMGU 4A, NEPIX 4A, OLNOP 4A, RENVI 4A, ROTKO 4A).
Message
[US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) NOT AUTHORIZED DUE TO CONSTUCTION, ALL SIDS UNAVAILABLE; RNAV SID RWY 03 (ARFUT 2B, IBSAN 4B, MARXO 2B, NEMGU 4B, NEPIX 4B, OLNOP 4B, RENVI 4B, ROTKO 4B); RNAV SID RWY 21 (ARFUT 2A, IBSAN 4A, MARXO 2A, NEMGU 4A, NEPIX 4A, OLNOP 4A, RENVI 4A, ROTKO 4A)
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-05-08 13:51
Was this helpful?