A2459/26
Checking status...
ADApron Operations

Fuel hydrant shutdown due to work in progress affecting multiple stands.

2026-07-08 21:00 - 2026-07-10 03:30
Duration:VERY SHORTaggregated 13 hours

Period of Applicability

2026-07-08 21:00 - 2026-07-10 03:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Fuel hydrant shutdown due to work in progress affecting stands 1-17, 23-32, 41-44, and 47-58. The hydrant will remain active until the last into-plane fuelling has taken place. Flights requiring fuel within the shutdown period will be allocated a stand that is fuel served. Schedule: 2100-0330.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2459/26 NOTAMN
Q) EGTT/QFULT/IV/NBO/A /000/999/5321N00217W005
A) EGCC B) 2607082100 C) 2607100330
D) 2100-0330
E) FUEL HYDRANT SHUTDOWN DUE WIP AFFECTING STANDS 1-17, 23-32, 41-44,
AND 47-58. HYDRANT WILL REMAIN ACTIVE UNTIL THE LAST INTO PLANE
FUELLING HAS TAKEN PLACE. FLIGHTS REQUIRING FUEL WITHIN THE
SHUTDOWN PERIOD WILL BE ALLOCATED A STAND THAT IS FUEL SERVED.
Was this helpful?