Instrument approach procedures for non-RNAV 1 equipped/capable aircraft unavailable for runways 28R and 10L.
2024-09-30 07:55 - 2024-11-30 23:59
Period of Applicability
2024-09-30 07:55 - 2024-11-30 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
The instrument approach procedures for non-RNAV 1 equipped or capable aircraft are not available for runways 28R and 10L. Reference AIP EIDW AD 2.22 Flight Procedures, Section 2.3 and 2.4.
Message
INSTRUMENT APPROACH PROCEDURES FOR NON-RNAV 1 EQUIPPED/CAPABLE AIRCRAFT FOR RUNWAYS 28R AND 10L NOT AVAILABLE, REF AIP EIDW AD 2.22 FLIGHT PROCEDURES, SECTION 2.3 AND 2.4
Map Visualization
Preview
Loading map data
Please wait...
© OpenStreetMap contributors