A2490/26
EST
Checking status...
ADMPublication Updates

EPWA AIP low visibility procedure commencement and termination criteria are revised.

2026-08-28 13:33 - 2026-10-30 23:59
Duration:3 months EST

Period of Applicability

2026-08-28 13:33 - 2026-10-30 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

AIP IFR AD 2 EPWA 1-50 is amended to revise low visibility procedure (LVP) criteria. LVP operations commence when the arrival runway touchdown-zone RVR falls below 800 m, and/or any RVR falls below 550 m, and/or the cloud ceiling is 300 ft or lower. LVP terminates when the arrival runway touchdown-zone RVR reaches at least 800 m, and/or all RVR values reach at least 550 m and the cloud ceiling reaches at least 300 ft, with continuing improvement anticipated.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2490/26 NOTAMR A1409/26
Q) EPWW/QFAXX/IV/NBO/A /000/999/5210N02058E005
A) EPWA B) 2608281333 C) 2610302359EST
E) REF AIP IFR AD 2 EPWA 1-50 - CHANGE OF INFORMATION IN POINTS:
SHOULD BE:
7.1.2.1. LVP OPERATIONS WILL BE COMMENCED WHEN RVR TDZ ARR RWY FALLS
BELOW 800M AND/OR ANY OF THE RVR FALLS BELOW 550 M AND/OR THE CLOUD
CEILING FALLS TO OR BELOW 300 FT.
7.1.2.2. LVP WILL BE TERMINATED WHEN RVR TDZ ARR RWY INCREASE TO
800M OR MORE AND/OR ALL OF THE RVR INCREASE TO 550 M OR MORE AND THE
CLOUD CEILING REACHES 300 FT OR MORE AND A CONTINUING IMPROVEMENT IS
ANTICIPATED.
INSTEAD OF:
7.1.2.1. LVP OPERATIONS WILL BE COMMENCED WHEN ANY OF THE RVR FALLS
BELOW 550 M AND/OR THE CLOUD CEILING FALLS BELOW 200 FT.
7.1.2.2. LVP WILL BE TERMINATED WHEN ALL OF THE RVR INCREASE OVER
550 M AND THE CLOUD CEILING REACHES 200 FT OR MORE AND A CONTINUING
IMPROVEMENT IS ANTICIPATED.
Was this helpful?