V0017/25
Checking status...
Approach Procedures

Change of operating status for TACAN RWY 09 at Ramstein Ab.

2025-03-25 08:58 - 2025-05-16 00:01

Period of Applicability

2025-03-25 08:58 - 2025-05-16 00:01

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The operating status for the TACAN RWY 09 instrument approach procedure at Ramstein Ab (ETAR) has changed, affecting minimum visibility requirements for Category ABCDE procedures.

Message

[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED TACAN RWY 09 S-09 MINIMA CAT ABCDE 1560-2900M 800 (800-2900M). WHEN ALS INOP INCREASE CAT ABCDE VIS TO 3600M.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

V0017/25 NOTAMN 
Q) EDGG/QPICH/I/BO/A/000/999/4926N00736E005 
A) ETAR 
B) 2503250858 
C) 2505160001 
E) [US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED TACAN RWY 09 S-09 MINIMA CAT ABCDE 1560-2900M 800 (800-2900M). WHEN ALS INOP INCREASE CAT ABCDE VIS TO 3600M.
Issued at: 2025-03-25 08:58
Was this helpful?