P5848/25
Checking status...
ADTaxiway Operations

TACAN checkpoint sign on Taxiway Echo South not illuminated.

2025-08-08 21:44 - 2025-11-06 23:59
Duration:LONG4 months

Period of Applicability

2025-08-08 21:44 - 2025-11-06 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The TACAN checkpoint sign located on Taxiway Echo South is not illuminated, which may affect navigation for aircraft using this taxiway.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) EDGG/QMXLT/IV/M  /A /000/999/4926N00736E005
A) ETAR B) 2508082144 C) 2511062359
E) TACAN CHECKPOINT SIGN LOCATED ON TAXIWAY ECHO SOUTH NOT
ILLUMINATED.
Was this helpful?