F0101/25
Checking status...
Publication Updates

Amendments to RNAV (GNSS) procedures for FAOR effective 15 May 2025.

2025-06-13 15:14 - PERM

Period of Applicability

2025-06-13 15:14 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Amendments to aeronautical data for FAOR include changes to RNAV (GNSS) procedures for runways 03R and 21L, effective from 15 May 2025, specifically altering the speed on waypoint OR371 to -210.

Message

HAND AMEND BELOW FAOR AERONAUTICAL DATA TABULATION AS FLW: ARR-08A RNAV (GNSS) RWY 03R DATED 15 MAY 2025 SPEED ON WAYPOINT OR371 TO READ -210. ARR-19A RNAV (GNSS) RWY 21L DATED 15 MAY 2025 SPEED ON WA...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

F0101/25 NOTAMR F0088/25 
Q) FAJA/QOAXX/IV/BO/A/000/999/2608S02815E005
A) FAOR B) 2506131514 C) PERM
E) HAND AMEND BELOW FAOR AERONAUTICAL DATA TABULATION AS FLW:
ARR-08A RNAV (GNSS) RWY 03R DATED 15 MAY 2025 SPEED ON WAYPOINT OR371
TO READ -210.
ARR-19A RNAV (GNSS) RWY 21L DATED 15 MAY 2025 SPEED ON WAYPOINT OR386
TO READ -210.
ARR-22A RWY 21L DATED 15 MAY 2025 SPEED ON WAYPOINT OR369 TO READ
-210.
ARR-23A RNAV (GNSS) RWY 03R DATED 15 MAY 2025 SPEED ON WAYPOINT OR392
TO READ -210.
ARR-25A RNAV (GNSS) RWY 21L DATED 15 MAY 2025 SPEED ON WATPOINT OR384
TO READ -210.
ARR-18A RNAV (GNSS) RWY 21L DATED 17 APRIL 2025 SPEED ON WAYPOINT
OR365 TO READ -210.
Issued 21 days ago
Was this helpful?