A0197/25
Checking status...
Runway Operations

Stormwater drainage built on runway 08/26 strip 75m from RCL.

2025-07-17 08:30 - PERM

Period of Applicability

2025-07-17 08:30 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Stormwater drainage has been constructed on the runway 08/26 strip, 75 meters from the runway centerline. This NOTAM supersedes AIP SUP A04/25.

Message

STORMWATER DRAINAGE BUILT ON RWY 08/26 STRIP 75M FM RCL. NOTAM SUPERSEDES AIP SUP A04/25.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) FBGR/QMWXX/IV/NBO/A/000/999/1749S02509E005
A) FBKE B) 2507170830 C) PERM
E) STORMWATER DRAINAGE BUILT ON RWY 08/26 STRIP 75M FM RCL.
NOTAM SUPERSEDES AIP SUP A04/25.
Issued about 2 months ago
Was this helpful?