M0090/26
Checking status...
ADRunway Operations

Construction area caution in the runway primary surface area.

2026-05-05 01:11 - 2026-08-02 23:59
Duration:LONG3 months

Period of Applicability

2026-05-05 01:11 - 2026-08-02 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Construction area caution: personnel and equipment are located within the runway primary surface area.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

M0090/26 NOTAMN Q) FIMM/QFAHW/IV/BO/A/000/999/0718S07224E005 A) FJDG B) 2605050111 C) 2608022359 E) AERODROME CONST AREA CAUTION; PSNL AND EQUIPMENT LOCATED WITHIN THE RWY PRIMARY SURFACE AREA.
Was this helpful?