A0151/25
Checking status...
Construction Activity

Topographic surveys conducted over entire airport FKKD.

2025-02-14 05:01 - 2025-02-27 16:00

Period of Applicability

2025-02-14 05:01 - 2025-02-27 16:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Unmanned aircraft operations (UA) will be conducted over the entire airport for topographic surveys. This is part of a technical study to assess and ensure conformity of certain parts of the movement area within a delimited geographic region. Operations will occur from the ground up to 330 feet above ground level (AGL).

Message

UA OVER ENTIRE AIRPORT ROW FOR CARRYING OUT TOPOGRAPHIC SURVEYS FOR A TECHNICAL STUDY AIMING THE COFORMITY OF CERTAIN PARTS OF THE MOVEMENT AREA WITHIN AREA DELIMITATED BY: 040203.71N0094307.37E-04014...

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0151/25 NOTAMN 
Q) FCCC/QWULW/IV/BO/AW/000/004/0400N00943E004
A) FKKD B) 2502140501 C) 2502271600 EST
E) UA OVER ENTIRE AIRPORT ROW FOR CARRYING OUT TOPOGRAPHIC SURVEYS FOR
A TECHNICAL STUDY AIMING THE COFORMITY OF CERTAIN PARTS OF THE
MOVEMENT AREA WITHIN AREA DELIMITATED BY:
040203.71N0094307.37E-040142.43N0094334.89E-
040113.79N0094342.58E-040114.28N0094327.30E-
040102.86N0094330.82E-040107.00N0094345.49E-
040013.48N0094411.76E-035942.19N0094517.31E-
035935.61N0094517.13E-035937.37N0094509.38E-
035904.74N0094458.53E-035856.24N0094501.72E-
035835.30N0094429.82E-035846.89N0094406.90E-
035857.69N0094409.96E-040024.46N0094245.95E-
040027.49N0094222.69E-040110.40N0094157.17E-
040056.89N0094219.59E-040111.93N0094220.79E-
040203.71N0094307.37E
F) GND G) 330FT AGL
Issued at: 2025-02-13 10:21